Skip to content
All templates

Manufacturing

Manufacturing quote by process step.

Machining, finish, QC, and tooling — a factory-ready offer.

Quote preview

Sample preview — demo data

Manufacturing

Manufacturing quote

No.2026081301DateAug 13, 2026Valid until-
From

Sample Tech Co.

Alex Chen · sales@example.com

Customer

Acme Trading Ltd.

Jamie Lee · buyer@example.com · +1 415 555 0134

Production scope

Production items

#Product imageProduct nameQtyUnitUnit priceDiscount %Subtotal
1
-
CNC roughing (pc)2008.500.001700.00
2
-
CNC finishing (pc)20010.000.002000.00
3
-
Tapping / chamfer (pc)2001.200.00240.00
4
-
Anodizing (pc)2003.200.00640.00
5
-
Sand-blast prep (pc)2000.800.00160.00
6
-
Incoming QC1420.000.00420.00
7
-
In-process QC1280.000.00280.00
8
-
Final QC1360.000.00360.00
9
-
Packing (bag / box)2000.600.00120.00
10
-
Fixture amortization12400.000.002400.00
11
-
First-article samples585.000.00425.00
12
-
Outbound freight1480.000.00480.00

Total: $9,225.00

Cost summary

Total (excl. tax)

= Production items

$9,225.00

Tax rate

13%

$1,199.25

Discount

$0.00

Prepaid

$0.00

Remaining

= Total (excl. tax) + Total (excl. tax) * (Tax rate / 100) - Discount - Prepaid

$10,424.25

Business account

****

Account name

***

Bank

****

1. Priced to approved drawings/process. 2. Material spikes may be re-quoted. 3. Volume after first-article approval.

Manufacturing quotes must track the drawing. Split piece price and one-off fixtures so buyers see both.

Try without signup; register to keep revisions.

How to use this Manufacturing quote template

Fill the Manufacturing quote template online and export a PDF — no Excel download.

  1. 1

    Preview the layout

    See a sample Manufacturing quote template with demo data on this page.

  2. 2

    Open the editor

    Click Use this template. No signup required to try.

  3. 3

    Fill and export PDF

    Enter your letterhead and line items. Totals update automatically. Download a professional PDF.

Common questions

How to show tooling?
Add a fixture amortization line, separate from unit price.
Molding or sheet metal?
Yes. Rename process rows.
How do I create a Manufacturing quote template without Excel?
No spreadsheet download needed. Preview this page, click Use this template, fill it online (totals update automatically), and export PDF. Guests get 2 quotes per IP per day; register to save and reuse.

Use this manufacturing template

A process-based quote factories can stand behind.